35 posts

Cleaning up the Lab

Today at the NASA lab, several students and mentors were working together to clean up the workspace and prepare for the build season. The computer workstations upstairs were put together after the painting. All of the wires were nicely ziptied and the process…

2011 FRC Build Season
Read post

Floor Painting Complete

Today the mezzanine floor was completely dry which allowed the tables and chairs to be moved back upstairs. A few students were present and helped set up the computers and get things ready for the upcoming FRC build season. The office supplies and mentors…

2011 FRC Build Season
Read post

254D High Hangs!

VEX Team 254D has been working hard since their last tournament to improve on their design as much as possible. After a lot of work, their robot successfully high hangs on the ladder for a whopping 20 points! All of the Team 254 VEX Teams are busy pulling…

2011 FRC Build Season
Read post

Lab Floor Painting & Cleaning

Today, more team members met at the NASA lab to apply a second coat of paint to the floor on the upstairs mezzanine. The newly painted surface looks great and we will move the furniture upstairs tomorrow once the paint dries. Furthermore, we mopped and…

2011 FRC Build Season
Read post

Lab Floor Painting

Today, several team members met at the NASA lab to paint the floor of the upstairs mezzanine. Two weeks ago, we sanded the floor to remove the chipping paint and last week new paint was able to be purchased. To prevent chipping, we are using a urethane-based…

2011 FRC Build Season
Read post