36 posts

Part Management System

2013 FRC Build SeasonFIRST Robotics

To help manage the robot parts in CAD and their manufacturing status, there is a new web-based part management system located at parts.team254.com. This system assigns official part numbers, stores information about parts and the materials required to make them, and shows the current manufacturing status of each part.

Parts currently in the manufacturing pipelineParts currently in the manufacturing pipeline

Build Season Recipes: Week 0

2013 FRC Build SeasonFIRST Robotics

I received a couple of requests for the cookie recipe from Kickoff weekend, so I'll just post it here on the build blog. Stay tuned for future weekly deliciousness and nutritiousness!

Double Chocolate Cookies

  • 1 cup butter

  • 1 cup sugar

  • 1/2 cup brown sugar

  • 1 tsp. vanilla extract

  • 1 egg

  • 1/3 cup cocoa powder

  • 2 tbsp. milk

  • 1 3/4 cups flour

  • 3/4 tsp. baking soda

  • 3/4 cup chocolate chips

Cream butter, sugars and vanilla extract. Add egg, milk and cocoa; beat. Add flour and baking soda and mix just until blended. Stir in chocolate chips. Drop on cookie sheet and bake at 350°F for 12 minutes.

Day #3: Design Discussion

2013 FRC Build SeasonFIRST Robotics

Today was the first weekday of build and with fewer member attendances, there was a lot of individual work getting done. Majority of time was spent in conversation between students and mentors on design decisions.

Prototyping

Three different designs are continuing to be prototyped:

  • Arm design
    • Started installing a longer piston
    • Increase range of motion to have greater spin
    • Extended arm length
  • Linear Design
    • Wood bottom plate removed because of warping
    • Bottom plate replaced with metal bars to reduce bend
    • Added electrical tape to increase traction
    • Adjustments made to effectively improve consistency
  • Radius design
    • No work was done on the radius design today

Design

Mentors and students continued designing the robot baseplate and the drivebase in Solidworks. The drivebase was completed before Nagy lost all his work. It will be completed tomorrow at school.

New discussion outcomes:

  • 32" x 24" frame

nagy

Additional testing

Students began to install 4 new Talon speed controllers on the 2012 robot Skyfire drive motors to replace the Victor speed controllers. Later on, the Talons will be tested and then based on results, the team can decide which speed controller to use for competition.

talons

 

Programming

The programming team worked on implementing a trapezoidal motion profile to accompany PID control, which involved quite a bit of math. Meanwhile, other programmers continued working on a way to read constants' values from a text file, and update the constants accordingly. Tomorrow, we hope to make adjustments to the code to use Talons instead of Victors, and test drive the 2012 robot.

Action Items for Tomorrow:

  • Finish drivebase CAD (restore Nagy's lost work)
  • Continue Prototyping
  • Add support for Talon speed controllers in code, test, and compare with Victor speed controllers

 Lab closing time for the night was at  10:30pm

Day #2: Finished Pyramid!

2013 FRC Build SeasonFIRST Robotics#FRC Build Blog

Today the team got a great start as soon as we could access the lab, making substantial progress on a multitude of projects.

Prototyping

Today in prototyping the team pursued our 3 designs decided yesterday for shooting mechanisms which are:

  • Radius design

    • Continued to try and make shots using the pneumatic air wrench to

      drive the flywheel

    • Used the strategy of touching the pyramid to take shots without being hit by opponent robots

    • Created a feeding device to automatically load frisbees into the shooter

 

Radial shooter

  • Linear Design

    • CNC machined part of the belt mechanism to create a tensioned timing belt system to launch the frisbee

    • Added guide rails to create a solid static wall opposing the timing belt to create spin on the frisbee

    • Added flanges to the pulleys to help guide the timing belts

    • The pulleys are powered by a direct mounted CIM Motor running at 5300 RPM

    • Shows promising capabilities both in power and spin and is being pursued in greater depthLinear

  • Arm Design

    • Completed initial prototype design

    • Mechanism is powered by a 1 stroke piston

    • Semi-effective at short range

    • Needs to be modified to increase range and spin to be able to get a better understanding of its capabilitiesFlinger

Design

The decision was made to build a modified version of the 2011 drive system which operated a 6 Wheel Drivetrain System with two speed gearboxes (high gear at 19.8fps, low gear at 7fps). Center wheels are lowered to allow for maximum maneuverability. 3.5″ wheels keep the robot center of gravity very low to the ground. Additional design improvements have been pushed to tomorrow for final decisions. The team is still in the process of brainstorming designs for both intake and climbing/hanging mechanisms.

Gearbox

The part drawings for the main shafts in our drivetrain are completed and ready to be sent out to sponsors. The completed drawings are for the following parts:

  • Drive Gearbox Output Shaft

  • Drive Gearbox Intermediate Shaft

  • Wheel Shaft Medium

  • Wheel Shaft Short

Screen Shot 2013-01-07 at 10.45.25 AM

Output shaft drawing

 

Field Construction

Students completed all components and assembly of the pyramid, creating a solid basis for hanging prototype testing.

sketchpyramid

Machining

The CNC mill was used to mill components for the linear shooter prototype and is prepared to be in around-the-clock machining as soon as the preliminary metal shipment has arrived.

Programming

The programmers began to write some code in Java to deploy to the 2012 robot. They used the CommandBasedRobot structure for the code, and fixed all previous errors that popped up before during deployment.  The code was deployed and ran successfully. Currently, the team has a completed drive subsystem and a couple drive commands.  In addition, some students worked on a system to read values from a file for on-the-go constants editing.

 Lab closing time for the night was at  1:00am

FRC Season Day #1: Kickoff

2013 FRC Build SeasonFIRST Robotics#FRC Build Blog

After the whole team kickoff-unveiling event at BCP, students came to the NASA lab at 1:00pm to begin discussing game strategy, going over the new game rules in detail, and began numerous design, prototyping and field assembly tasks throughout the course of the day. Prototyping A couple of groups were created which began making prototypes to test the fundamental concepts of shooting Frisbee discs. A few objective requirements that are being looked at in these designs include:

  • Accuracy
  • Precision
  • Size/Volume occupied
  • Power requirements
  • Design integration ease
  • Feeding/indexing/loading ease
  • Need for adjustability

Three different designs are currently being prototyped:

Radius Design

Radial Design

  • The radial design uses a fixed wheel spinning on an axle surrounded by a circular track for a frisbee. By doing this there it simultaneously adds speed to the frisbee using the rotating wheel and spin using the far wall of the track that is padded with self-insulating electrical tape for increased grip.
  • We used many different iterations of motors starting with Dewalt drills, but opted for more power using pneumatic drills running off shop air spinning the wheel at 5250 RPM.
  • Using the higher RPM we were able to semi-accurately shoot from 10ft away from the high goal.
  • A working prototype was created and tested today as shown in the video above

Linear Design

  • This design is an iteration of the Radius design, but packaged more tightly to accelerate the Frisbee disc linearly, instead of around a radiused backboard
  • The idea was created as a derivative of the Radius design, coming from the need for a compact shooting mechanism. Utilizing the same idea of a static surface combined with a spinning propellant, we designed a system that uses a direct mounted CIM motor to power a timing belt pulley system to increase speed of the frisbee in a single linear movement.
  • CAD models of this design were completed and fabrication was started today

Thrower Arm Design

  • This design is most similar to a clay pigeon device
  • The main mechanism of this design is a flinging arm that propels the frisbee as it travels from the center of the device towards the outer most edge
  • Fabrication of this design was started and photos will be added when a preliminary model is created

Design Preliminary design decisions were briefly discussed regarding drivetrain configuration, wheel size, and speeds/ratios.  Final drivetrain decisions and preliminary designs for some drive components will be decided and completed at tomorrow's meeting.  Gearbox and wheel shaft models and drawings are scheduled to be completed by Sunday night, to deliver for manufacturing at our sponsor on Monday morning. Preliminary discussion outcomes:

  • 6WD with 3.5" Wheels
  • 2-speed WCD (West Coast Drive)
  • ~2011 speeds (with the capability to swap in a smaller pinion to go slower)
  • Flat base plate
  • 2011 style bumper mounts

Field Construction Students began working on building and assembling the high goal and the pyramid field objects.  The High Goal stand was completed and mounted onto the game field. The assembly of the pyramid is underway, with its top goal almost complete; all components are made, but still need to be assembled together. Screen Shot 2013-01-06 at 9.59.50 PM Manufacturing Final machine set-up and warm-up procedures were completed today which should allow us to start machining competiton parts tomorrow. Action Items for Tomorrow

  • Acquire missing pyramid parts, assemble pyramid base and goal, assemble pyramid.
  • Complete linear Frisbee shooter prototype & test
  • Begin intake design and prototyping discussions
  • Start and complete drivetrain gearbox designs and shaft drawings
  • Discuss merits and perform objective analysis/ranking on hanging mechanisms & feasibility

 Lab closing time for the night was at  12:30am

Team 254 Helps out at Toys for Tots

FIRST Robotics

On Saturday December 22nd, 27 Cheesy Poofs came together to help needy children in the Santa  Clara Valley.  The members donated over 70 hours to help distribute gifts to the needy and bring smiles to their faces.   The boys were painting faces and hands with Christmas scenes,  running games with prizes, cooking hot dogs, distributing food  and demoing Skyfire to the delight of all ages.  This is the 25th Annual  US Marines Toys for Tots event at the Fairgrounds and it was expected to reach 7,000-9,000 children.