78 posts

Progress

Today, the team worked to optimize the kicker and arm. The surgical tubing on the kicker was replaced with trampoline springs, to make it more easy to get a repeatable and known force. A gas spring was installed on the first stage of the arm to aid in arm…

2010 Teams 254/968 Collaborative Build Blog
Read post

Design Progress

Today, the design team worked to design the polycarbonate side shields for the robots. Due to weight issues, we will probably not be able to implement all of the polycarbonate shields on the robot. The team also designed the cutouts which will be made on the…

2010 Teams 254/968 Collaborative Build Blog
Read post

Modified Kicker

Today the kicker plate was shortened. The shorter plate contacts the ball higher up on the ball, giving it a flatter trajectory. A rope was added as a hard stop, which prevents the kicker from contacting the roller system. Original video unavailable. Original…

2010 Teams 254/968 Collaborative Build Blog
Read post

More Progress

At the proving grounds, multiple teams worked on various parts of the robot to ensure that major components will be complete by the weekend. In the design department, students and mentors completed the PCB design for both the gyroscope carrier and a revised…

2010 Teams 254/968 Collaborative Build Blog
Read post