Manufacturing: Tonight we completed the four piston bearing blocks (1010073) for the kicker winch. These took much longer than anticipated using manual machines. Below is a picture of the completed parts: For the small piston bearing blocks (1010019) we hope…
After receiving our frames very late last night, we began wiring today. We mounted all of the electronics and ran the 4 gauge primary power wires. We then proceeded to run wires for the Victor 884 speed controllers. After several separate configurations, the…
Today we completed the 32 bumper mounting pins and brackets, and 20 control board spacers. The bumper mounting scheme is nearly identical to the 968 2009 bumpers. The finished parts are shown below. Next, we hope to cut the control board polycarbonate on a…
Design: The team has finalized CAD designs for our kicking device and has finalized all mechanisms. Parts: A set of manufactured parts has been sent to our sister team, 968. Manufacturing: We are continuing manufacture of dogs for our kicker shaft. Design:…
We haz powdercoat. Unfortunately, Central Powder Coating was not well staffed today. They will have the 254 frames powdercoated blue streak #2 tomorrow morning. We will be picking up the blue frames tomorrow at 10AM.
This revision includes the cutout for the Classmate pc, contours and filets for the ethernet jack, holes for the LED mounts, screwdriver slots for the Cypress board and finally, an additional cutout that replaced the roller button.
Manufacturing Pacific Precision is able to make the output shafts; unfortunately they will not be done until late next week. We also confirmed that the robot frames will be ready to be picked up from Central Powder Coating at the end of business day Thursday.…
MANUFACTURING The manufacturing team has been working hard to complete parts for the drivebase. After completing gears and sprockets, we have moved onto the construction of the shifting dogs for both the drivetrain and the kicker winch. DESIGN The design team…
Today the welding was completed at Ride & Show Engineering, and the frames were delivered to Central Powder coating. The picture below shows us with the kind folks at Ride & Show.