35 posts

Cleaning up the Lab

2011 FRC Build Season

Today at the NASA lab, several students and mentors were working together to clean up the workspace and prepare for the build season.

The computer workstations upstairs were put together after the painting.  All of the wires were nicely ziptied and the process of software updates began.  In the next few days, we need to update all of the computers with current versions of SolidWorks and other crucial software.  Furthermore, we need to build a wired network at the lab so that we can share printers between the computers.  On the white boards, vinyl stickers were cut to label each teams' white board.

Downstairs, Devastator was prepared to be removed from the NASA lab for semi-permanent storage at Bellarmine so that it can be used for team outreach events and demonstrations.  This freed up space under the south stairwell so that we were able to move the vertical bandsaw into its own cavity, improving the safety of the workspace.  We also spread out the sanding and grinding area and moved a wall-mounted shop vac out of the sheet metal area into the sanding and grinding area so dust and debris can be vaccumed up.

In the sheet metal and welding corner of the lab, work continued to prepare the area.  We re-arranged the extremely heavy equipment, putting the welder in a position so that its cord could reach the outlet and so that it is easily accessible.  To accommodate these changes, we had to slightly adjust the positioning of the sheet metal shear and break and move the large arbor press into the machine shop.

In the general work area, we continued cleaning and organization and also began resurfacing the workbenches so that they have nice, smooth surfaces to work on.

Everything is coming along great and we are very excited for the Saturday FRC kickoff.

Floor Painting Complete

2011 FRC Build Season

Today the mezzanine floor was completely dry which allowed the tables and chairs to be moved back upstairs.  A few students were present and helped set up the computers and get things ready for the upcoming FRC build season.  The office supplies and mentors cabinets were also sorted, leaving only a few tasks left to be completed tomorrow and Thursday.

254D High Hangs!

2011 FRC Build Season

VEX Team 254D has been working hard since their last tournament to improve on their design as much as possible.  After a lot of work, their robot successfully high hangs on the ladder for a whopping 20 points!

All of the Team 254 VEX Teams are busy pulling together their robots before their Thursday deadline.

Lab Floor Painting & Cleaning

2011 FRC Build Season

Today, more team members met at the NASA lab to apply a second coat of paint to the floor on the upstairs mezzanine.  The newly painted surface looks great and we will move the furniture upstairs tomorrow once the paint dries.  Furthermore, we mopped and vacuumed the floor downstairs and organized the tool chest, the white shelves and the cabinet in the machine shop.

Lab Floor Painting

2011 FRC Build Season

Today, several team members met at the NASA lab to paint the floor of the upstairs mezzanine.  Two weeks ago, we sanded the floor to remove the chipping paint and last week new paint was able to be purchased.  To prevent chipping, we are using a urethane-based industrial paint.  Tomorrow, we will meet again to apply a second coat of paint.