Day 28: Bag and Tag Day Robot Progress General Assembly Today, we started by receiving news that after visiting 3 anodizing places, we could get parts for our hopper and hanger anodized for the competition robot. After calling, we knew that we would receive…
Day 24 and 25: Continued Assembly and Programming Assembly General Assembly We have almost completed wiring on the practice robot. We are waiting on a few competition subsystems to be assembled then we will be moving on to pneumatics. Last night, we had the…
Day 23: Continued Assembly Hopper Progress Robot Progress Almost all our parts are back from anodizing and we are trying to rapidly assemble as much of the robot as possible. The team working on putting surgical tubing over the rollers is almost finished and…
Day 22: Finishing Up The Field Robot Progress Today was a productive manufacturing and assembly day even though we didn't have our anodized parts back. We took off the superstructure today to make holes to run wiring from the shooter and feeder motors and…
Day 20 & 21: Field and Robot Construction Robot We are focusing heavily on manufacturing to make sure all the parts for the robot are ready; we sent several parts to anodize this morning. We also have a shooter and intake assembled and hope to finish the…
Day 19: Prototyping, Drivebase, and Programming Prototyping Shooter The shooter design is almost done. We are moving forward with 20 degree trajectory and tangent hood section out to 45 degree, to match the prototype. It should be ready to make this weekend.…
Day 18: Hopper Progress Prototyping Hopper / Feeder Today we continued work on the hopper/feeder prototype. We went through a few more iterations revolving around the central design of a powered floor of rollers, but nothing seemed to stand out as notably…
Day 17: Prototyping, Drivebase, CAD Prototyping Zipper Hopper Today was essentially our drop dead date for finalizing 90% of the hopper in CAD. We took our roller design and decided to ship it, with a center to center distance of less than 50mm, as the 55mm…
Day 16: Zipper Hopper and Intake Prototyping Zipper Hopper Today we solved the problems of the previous designs by removing the polycord and replacing it with chain. While disassembling the prototype, we found another link of the polycord which melted onto…
Day 15: Drivebase, Prototypes, and Program Wiring for Drivebase Today we began wiring the drivebases. We have all of the Talon SRXs done and we have installed most of the components. We have a lot more work to do, and we will be working hard to get it done as…