Today, we (almost) finished assembling the drivetrain and kicker winch gearboxes. We also made further progress on the bumper fabrication.
Here's some photos to pass your time.
News, events, and updates from Team 254.
Today progress was made on the bumper pieces, including machining the wood and corner brackets. We hope to finish the bumper structure by the end of Friday, to begin material cutting and sewing on Saturday. At this time, I do not expect the bumpers to be complete before ship, as the sewing is estimated to take a few days.
Tonight we drilled the arms to fit the bushings. Below is a picture showing the drilling operation.
Tomorrow we will begin assembling the arm, and make any necessary adjustments for proper fitment.
MANUFACTURING
The manufacturing team worked hard today to machine the ratchets and finish the bar grabbing clamps. The lathe was also hard at work making spacers, standoffs and shafts.
ASSEMBLY
After the arms returned from the powder coat shop today, several members of the assembly team assembled one complete arm (minus sprockets which will arrive from anodize tomorrow).
FIELD CONSTRUCTION
The field construction team worked hard today to continue to carpet the bumps and other field elements. The field should be completed in the next few days.
At the proving grounds, multiple teams worked on various parts of the robot to ensure that major components will be complete by the weekend.
In the design department, students and mentors completed the PCB design for both the gyroscope carrier and a revised LED driver. The PCB was sent to fab at 11:00PM. We will receive them Friday.
Down at the assembly line, students and mentors assembled major components in the drivetrain gearboxes. Unfortunately, the entire gearbox was not fully assembled due to the lack of a few components(PTO sprocket, gearbox standoffs).
Both robots' wiring is almost complete. Tomorrow, we will complete the wiring by adding the 4AWG cables.
Due to a manufacturing error we are issuing an immediate recall of part no. 1010081. We apologize for the inconvenience this may have caused you. The part requires a bore to .722 in order to fit onto the 5/8 hex shaft. If you lack the tools necessary to carry out this change please notify us. We can be reached by post, phone, or email. Thank you again for your patience and understanding and as always, choose Team 254.
Today our procurement personell spent the day picking up several parts and materials, including plywood for the bumpers and switches, wire, and LEDs for the control boards. The plywood selected for the bumpers is a premium quality 12-Ply 3/4" Russian Baltic Birch. The 5" height blanks were cut today, and will be cut to length tomorrow. Below is a picture of cutting the bumper pieces.
The picture below shows construction and testing of the LED driver circuits for the control board.
Finally, we picked up the other two upper arm segments from welding. They are shown in the picture below. These are for 254.
DESIGN
The design is coming along and is almost finalized. The roller assembly is completely finalized and several small details need to be ironed out elsewhere on the robot.
MANUFACTURING
The manufacturing team worked hard today to produce several lathe parts including the drivetrain shifter shafts, the drivetrain shifter shaft spacers and the rear axles (which needed encoder holes drilled in them). The CNC team did plate work today, making the drivetrain piston mount plates and starting on the kicker plates.
PART PROCUREMENT
The [hopefully] last batch of parts from McMaster has been ordered, giving us the parts to complete our rollers. Two AndyMark orders have also arrived, allowing us to proceed on modifying the roller sprockets for transportation to 968.
PRACTICE FIELD SET-UP
Today, the lab contained a large group of students intent on completing important field setup tasks. The side borders have been setup and the towers have been placed in their final position. Some of the bumps are laid out but we are still waiting on carpet from FIRST.
CRATE BUILDING
The crate building team worked hard today to attach the last remaining side (the bottom) to the metal frame using wood screws. Several vinyl stickers were also cut and applied to the crate.
After an all-night machining marathon last night, the arm parts were completed to be welded today. Our generous supporter Foes Racing was able to align and tack weld all the pieces into place this evening. Foes did the welding for the launcher and top arm in 2008 also. Below are some quick snapshots of the parts just before leaving Foes for the evening. The arm parts will be welded tomorrow night. Please take a close look at how everything is assembled, and quickly bring it to our attention if anything seems incorrect.
Efforts were made to align holes in waterjetted pieces with holes in the box tube pieces, and to ensure squareness during the tack-welding process. After welding is complete, a 0.875 reamer and a 1.250 reamer will be needed to enlarge the holes in the waterjetted pieces. Additionally, all threaded holes still need to be drilled and tapped.